目 录
1 编制依据········································································3
2 工程概况········································································3
3 施工准备工作··································································3
3.1 技术准备工作································································3
3.2 测量工具准备································································4
3.3 施工现场准备································································4
3.4 施工测量任务································································4
3.5 施测程序······································································5
4 施工测量的基本要求·························································5
4.1 施测原则······································································5
4.2 建筑物平面控制网布网原则··············································5
4.3 建筑物平面控制网测设····················································6
4.4 高程控制网布置原则·······················································6
4.5 高程控制网测设·····························································7
4.6 水准测量技术要求···························································7
5 ±0.000 以下施工测量··························································7
5.1 起始依据的校测·····························································7
5.2 基础平面轴线投测方法····················································7
5.3 地下室梁、墙、柱平面控制线测量·····································8
5.4 标高控制量···································································8
6 ±0.000 以上施工测量··························································9
6.1 平面控制······································································9
6.2 高程控制····································································12
6.3 测量成果的验收···························································13
6.4 建筑物大角铅直度控制··················································15
6.5 二次结构,建筑装饰及设备施工测量··························
·······15
7 沉降观测······································································15
7.1 沉降基准点布设···························································15
7.2 沉降基准点测量···························································16
7.3 观测周期····································································16
7.4 沉降资料的提交····························································16
8 测量技术资料················································· ···············16
9 质量保证措施································································17
10 安全保证措施·······························································17
1 编制依据
1.1 《建筑施工测量技术规程》DB11/T446-2007
1.2 《工程测量规范》GB50026-2007
1.3 华贸城六期施工蓝图
2 工程概况
为北中第目工京市
区规划红军营西路、京包铁路、羊坊东路及规划清河营路围合路块
开发单位为北京华贸奥苑房地产开发有限公司,监理单位为北京赛
瑞斯国际工程咨询有限公司,设计单位为北京市建筑设计研究院,
施工总承包单位为青建集团股份公司。工程开工日期为 2014 3
15 日,竣工日期均为 2015 905 日,总工期为 540 日历天。
D9D10D11D12D13D14
D15 独栋别墅部分组成总建筑面积为 30019.76m²,其中地上面积为
23560.18m²,地下面积为 6459.58m²。其中:
D9-D12 5004.27m²
13.4 1068.55m²3/4
3.1 米,建筑面积 3935.72m²。总建筑高度为 12.68 米。
D13-D14 为剪力墙结构,单体总建筑面积为 4378.20m²。其中地
13.4 939.93m²3/4
3.1 米,建筑面积 3438.27m²。总建筑高度为 12.68 米。
D15 为剪力墙结构,总建筑面积为 1246.28m²。其中地下 1
3.5 米,建筑面积 305.52m²;地上 3层,首层层高 3.2m,二、
三层均为 3.1 米,建筑面积 940.76m²。总建筑高度为 9.7 米。
别墅以及、外坡屋
部位为本工程放线的重中之重。
3 施工准备工作
3.1 技术准备工作
3.11 根据建设单位提供的城市定位坐标点及高程控制点,进行复
核此 3处定位桩点。
3.12了解,认图纸员通
总平面图和设计说明的学习,了解工程总体布局,工程特点,周围
环境、建筑物的相对位置及坐标,了解现场测量坐标与建筑物的关
准点高程±0.000 对标
图后认真学习建筑施工图,及时校对建筑物的平面、立面、剖面尺
、构造,查看相关之的轴线及标高是否吻合,有无矛盾
3.13 据本工程的特点和施工测量的工作,项目技术部专业
量人员成立测量,依据测单位的坐标点和高程控制点,
工程定位,建立轴线控制网,规定程序检查验收;对施测组全体人员
进行详细的图纸交,分工。有测量施人员均
证上
3.2 测量工具准备
测量中所用尺,应按《中华民共和国计量法
,“使
或者超定周期,以及的计量
有计量定,必须按技术监局发布的有关
定规程,授权定部门进行。
3.2.1 测量仪器
设备名称 精
1光 BTD-2L 电
±2" 2 台
2 DZS3-1 水准 ±3mm 3 台
3 50m 钢±1mm 10 把
4 5m 卷若干
5讲机 6
6 BTS-800C 站仪 ±2" 1 台
7 激光铅直 1/20000 2 台
3.3 施工现场准备
施工现场已经按照要求进行了场地平
3.4 施工测量任务
本工程测量任务要包括平面控制测量,高层控制测量,建筑物定
位放线和基础施工测量,结构施工测量,建筑装饰设备安装施工
测量、变形测量等。
3.5 施测程序
4 施工测量的基本要求
4.1 施测原则
4.1.1 严格执行测量规范,建立建筑物平面控制网及高程控制网。
4.1.2 严格审核测量原始据的准测量放线与计工作
校核的工作方法。
4.1.3 定位工作自检互检再报检的工作制度。
4.1.4 遵守先整体后局部、高度控制度的工作程序。即先测设
高的场地体控制网,以控制网为依据进行局部建筑物
的定位、放线和测图。
4.2 建筑物平面控制网布网原则
4.2.1 控制点应选在通视条件良好,安全、的地方。
4.2.2 砌砖1.5m×1.5m
1m 架子管并挂写控制桩编号字样护架子管
白油漆达到美目的目的。
控制桩意图:
4.3 建筑物平面控制网测设
4.3.1 对本工程建筑物的结构及现场具体况,布设矩形轴线
控制网作为建筑物平面控制网。
4.3.2 施工测量人员依据北京市测院测量成果通单,使用经纬仪
站仪,其度为±2",测设矩形网作为建筑物平面控制网。
4.3.3 建筑物控制网标:
高层建筑物:测角中误差±12"边长相对中误差1/15000
别 墅 区 及 车 库 工 程: 测 角 中 误 差 ±24" 边 长 相 对 中 误 差
1/8000
4.4 高程控制网布置原则
4.4.1 为保证建筑物施工的度要求,在场区建立高程控制网
以此保证施工竖向精度。
4.4.2 高程控制网采用水准测法。
4.4.3 测量等为 国 三等水准测量,每 千 米 高 误 差
±3mm
4.4.4 高程控制测量采用附合测法。
4.4.5 高程控制点便于施测使
的地方,边缘不应小于基坑两倍。建筑场区高程控制
点布设在栋建筑物要建筑物附近不少
在施工期间应定期复测。
高 程 控 制 点 必 须 用 混 凝 土 砌 砖 维 护 , 外 设 平 面
1.5m×1.5m,高 1m 架子管并挂写有水准测量桩标识牌。围
护架子管刷白油漆达到美目的目的。
高程控制点的标设图:
4.5 高程控制网测设
DS3 水准对测的水准基点,合水准测
法,进行校验,合三等水准测量的技术要求,测设
场区高程控制点,填写水准测量观测录,进行测量平
4.6 水准测量技术要求
水准测量等
±3mm,全中误差≤±6mm仪器DS3,水准标尺为金塔
丝读数方法,每站序为---已知
返各±≤12mm
L
(L路线
km)
5 ±0.000 以下施工测量
5.1 起始依据的校测
依据红线、控
进行校测。
5.2 建筑物定位放线和基础平面轴线投测方法
5.2.1 建筑物定位放线
据建控制线控制
轴线控制桩测设建筑物角桩,根据角桩标定基挖边界灰线
等。
线20mm
1/6000且边长误差不大于 20mm
5.2.2 基础平面轴线投测方法
1 线使
摘要:

目录1编制依据········································································32工程概况········································································33施工准备工作··································································33.1技术准备工作···························································...

展开>> 收起<<
测量方案.docx

共24页,预览24页

还剩页未读, 继续阅读

温馨提示:66文库网--作为在线文档分享平台,一直注重给大家带来优质的阅读体验;让知识分享变得简单、有价值;海量文档供您查阅下载,让您的工作简单、轻松而高效! 1. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。 2. 66文库网仅提供信息存储空间,仅对广大用户、作者上传内容的表现方式做保护处理,对上传分享的文档内容本身不做任何修改或编辑,并不对下载的任何内容负责。 3. 广大用户、作者上传的文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。 4. 本站不保证、不承担下载资源内容的准确性、安全性和完整性, 同时也不承担用户因使用下载资源对自己和他人造成任何形式的伤害或损失。
分类:管理文献 价格:1库币 属性:24 页 大小:583.13KB 格式:DOCX 时间:2024-07-19
/ 24
客服
关注