电力建设安全工作规程
1
部分:火力发电
Code
of
safety operation
in
power engineering construction
P
t
1:
Steam power
2014
-
10-15
发布
2015-03-01
实施
国家能源局
发布
DL 5009.1 2014
I
本规程根据《国家能源局关于下达 2011 年第二批能源领域行
业标准制(修)订计划的通知》(国能科技〔2011252 号)的要
求,由电力行业火电建设标准化技术委员会负责,会同有关单位
DL 5009.12002《电力建设安全工作规程 1部分:火力发
电厂》基础上修订的。
DL 5009《电力建设安全工作规程》共 3个部分
DL 5009.11部分:火力发电
DL 5009.22部分:电力线路
DL 5009.33部分:变电站
本部分是 DL 5009 的第 1 部分:火力发电。
本部分共分 7章和 6个附录,主要内容是:1 总则、2 术语、
3 基本规定、4 综合管理、5 土建、6 安装、7 调整试验及试运
行。
本部分除 4.1 基础管理和附录为推荐性外,其余均为强制性。
本部分修订的主要内容:
1. 对整体章节结构重新进行了编排,新增1 总则”2
语”3 基本规定”4 综合管理”7 调整试验及试运行”章
节,4 综合管理”中“4.1 基础管理”4.2 安全防护设施和
动防护用品”4.4 环境影响和节能减排”4.6 特种设备”
4.8.11 承重平台”4.10.3 受限空间作业”4.10.4 邻近带电
体作业”4.14.2 防腐”等内容。将原规程3 施工现场”5
明施工”的内容合并到4.3 文明施工”原规程8 高处作业及
交叉作业”并入4.10 高风险作业”原规程19 砖石砌体及装
饰工程”拆分为“5.8 砖石砌体”和“5.9 饰装修”,原规程
18.1 预应力混凝土工程”并入“5.6 混凝土结构”中,原规程
DL 5009.1 2014
II
27 电气设备安装”28 母线安装”29 电缆”30 热控设
备安装”合并到6.3 电气和热控安装”其他内容均在原规程基
础上作了修订。
2. 对原规程中涉及已淘汰的安全技术、工艺、流程、装备和
材料相关条款进行了删改。
本部分由中国电力企业联合会提出。
本部分由电力行业火电建设标准化技术委员会归口并负责
解释。
本部分主编单位:中国电力建设企业协会、中国能源建设
团天津电力建设公司、中国能源建设集团安徽电力建设第二工程
公司、中国华电工程(集团)有限公司。
本部分参编单位:吉林省电力科学研究院有限公司、河南
一火电建设公司、河南第二火电建设公司、中国能源建设集团广
东省电力设计研究院、重庆电力建设总公司。
本部分主要起草人员:范幼林、周德福、刘少军、朱品德
高西、石玉成、高艳彬、周晓飞、邹怀君、刘文鑫、杜学芸、
饶凡、谢雪、杨亚东、叶翔、钱文、魏艳辉、黎军保、侯林、
刘艳玲、柏勇、刘庆辉。
本部分主要审查人员:宴新春、杜将武、安伟、卢建明、
时瑛胡殿金、奎正杨彦君、王立伟、谢华盛、陈桂明、
周正国、邬意惠、吕艳杰、陈利英、殷先亚、杨策、彭传斌、
王文祥、陶雷果、田福兴、程建棠、姚士东、郎德彬。
本部分自实施之日起代替 DL 5009.12002
本部分在执行过程中的意见或建议反馈至中国电力企业联
会标准化管理中心(北京市白广路二条一号,100761
DL 5009.1 2014
III
1 ·········································································
2 ·········································································
3 基本规定 ···································································
4 综合管理 ···································································
4.1 基础管理 ·································································
4.2 安全防护设施和劳动防护用品 ·········································
4.3 文明施工 ·································································
4.4 环境影响与节能减排 ····················································
4.5 施工用电 ·································································
4.6 特种设备 ·································································
4.7 小型施工机械及工具 ····················································
4.8 脚手架及承重平台 ······················································
4.9
······································································
4.10 高风险作业 ·····························································
4.11 季节性与特殊环境施工 ················································
4.12 起重与运输 ·····························································
4.13 焊接、切割与热处理 ··················································
4.14 防腐、防火与防爆 ·····················································
4.15 拆除工程 ·······························································
5 ·········································································
5.1 一般规定 ·································································
5.2 建筑机械 ·································································
5.3 土石方 ···································································
5.4
······································································
5.5 桩基及地基处理 ·························································
DL 5009.1 2014
IV
5.6 混凝土结构 ······························································
5.7 特殊构筑物 ······························································
5.8 砖石砌体 ·································································
5.9 装饰装修 ·································································
5.10
····································································
6 ·········································································
6.1 一般规定 ·································································
6.2 热机安装 ·································································
6.3 电气和热控安装 ·························································
6.4 金属检验 ·································································
6.5 修配加工 ·································································
7 调整试验及试运行 ·······················································
7.1 一般规定 ·································································
7.2 锅炉专业 ·································································
7.3 汽机专业 ·································································
7.4 电气专业 ·································································
7.5 热控专业 ·································································
7.6 化学专业 ·································································
附录 A 建设工程项目应建立的安全管理制度目录 ··················
附录 B 安全生产专项费用使用范围 ····································
附录 C 达到或超过一定规模的危险性较大的分部分项
工程目录 ····························································
附录 D 重要临时设施、重要施工工序、特殊作业、危险
作业项目 ····························································
附录 E 应办理安全施工作业票作业项目 ······························
附录 F 分包单位资质审查内容 ··········································
本部分用词说明 ·······························································
引用标准名录 ··································································
条文说明 ········································································
DL 5009.1 2014
V
Contents
1 General provisions ·························································
2 Terms ········································································
3 Basic Requirements ·······················································
4 Overall Management ······················································
4.1 Foundation management ·················································
4.2 the safety protection facilities and labor protection articles ···············
4.3 Civilized construction ····················································
4.4 the environmental effect and energy saving, emissions
reduction ·································································
4.5 Construction power ······················································
4.6 Special equipment ························································
4.7 Small Construction machinery and tools ·································
4.8 Scaffold and bearing platform ············································
4.9 Ladders ···································································
4.10 High risk work ··························································
4.11 Seasonal and special environment construction ·························
4.12 Lifting and transportation ···············································
4.13 Welding, cutting and heat treatment ·····································
4.14 Anti-corrosion, fire and explosion-proof work ··························
4.15 Dismantlement work ····················································
5 Civil Work ··································································
5.1 General requirements ·····················································
5.2 Construction machinery ··················································
DL 5009.1 2014
VI
5.3 Earth and rock works ·····················································
5.4 Blasting engineering ·····················································
5.5 Pile foundation and foundation treatment ································
5.6 Concrete structure ························································
5.7 Exceptional structure ·····················································
5.8 Brick masonry engineering ···············································
5.9 Decoration engineering ···················································
5.10 Auxiliary engineering ···················································
6 Installation Engineering ··················································
6.1 General requirements ·····················································
6.2 Thermal equipment ·······················································
6.3 The electricanl and thermal control installation ··························
6.4 Metallographic test ·······················································
6.5 Repair processing ························································
7 Adjustment test and commissioning ····································
7.1 General requirements ·····················································
7.2 Boiler unit ································································
7.3 Generator unit ····························································
7.4 Electric ···································································
7.5 C&I ······································································
7.6 Chemical ·································································
Appendix A Safety management system Catalogue to be
established by construction project ·························
Appendix B Applicable scope for safety work intended fund ·········
Appendix C Subitem & Subsection Catalogue for items of risk
reaching or exceeding certain scale ························
AppendixD Catalogue for Major temporary facilities major
construction procedure, special work and high
risk work ·······················································
DL 5009.1 2014
VII
Appendix E Catalogue for work requiring safety work permits ·······
Appendix F Subcontract unit qualification examination
content security ················································
Explanation of Wording in this Part ·········································
List of Quoted Standards ······················································
Addition: Explanation of Provisions ········································
DL 5009.1 2014
1
1
1.0.1 为加强火力发电工程建设项目安全生产工作,防止和减少
工程建设中生产安全事故,保障人员生命和财产安全,制定本
部分。
1.0.2 本部分规定了火力发电工程建设项目实施过程中应执行的
安全生产要求。
1.0.3 本部分适用于新建、扩建和改建的火力发电工程建设项目
(含核电站常规岛)建筑、安装、调试等安全生产工作。
1.0.4 火力发电工程建设项目安全生产工作除应符合本部分要求
外,尚应符合国家现行有关标准的规定。
DL 5009.1 2014
2
2
2.0.1 五新 five innovations
新技术、新工艺、新流程、新装备、新材料。
2.0.2 个体防护装备 personal protective equipment (PPE)
从业人员为防御物理、化学、生物等外界因素伤害所穿戴、
配备和使用的各种护品的总称。
注:在生产作业场所穿戴、配备和使用的劳动防护用品也称个体防护
装备。
2.0.3 高处作业 work at heights
在距坠落高度基准面 2m 2m以上有可能坠落的高处进行的
作业。
2.0.4 受限空间 confined spaces
封闭或者部分封闭,与外界相对隔离,出入口较为狭窄,自
然通风不良,易造成有毒有害、易燃易爆物质积聚或者氧含量不
足的设施、设备及场所。
2.0.5 承重平台 load bearing platform
存放一定重量材料或设备的平台。
2.0.6 特种设备 special equipment
对人身和财产安全有较大危险性的锅炉、压力容器(含气瓶)
压力管道、电梯、起重机械和场(厂)内专用机动车辆。

标签: #安全

摘要:

ICS27.010F09备案号:J192ι-2014DLp中华人民共和国电力行业标准DL5009.1-2014代替DL5009.1-2002电力建设安全工作规程第1部分:火力发电CodeofsafetyoperationinpowerengineeringconstructionP盯t1:Steampower2014-10-15发布2015-03-01实施国家能源局发布DL5009.1—2014I前言本规程根据《国家能源局关于下达2011年第二批能源领域行业标准制(修)订计划的通知》(国能科技〔2011〕252号)的要求,由电力行业火电建设标准化技术委员会负责,会同有关单位在DL5009.1—...

展开>> 收起<<
DL5009.1-2014 电力建设安全工作规程 第1部分:火力发电(非正版).pdf

共278页,预览278页

还剩页未读, 继续阅读

温馨提示:66文库网--作为在线文档分享平台,一直注重给大家带来优质的阅读体验;让知识分享变得简单、有价值;海量文档供您查阅下载,让您的工作简单、轻松而高效! 1. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。 2. 66文库网仅提供信息存储空间,仅对广大用户、作者上传内容的表现方式做保护处理,对上传分享的文档内容本身不做任何修改或编辑,并不对下载的任何内容负责。 3. 广大用户、作者上传的文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。 4. 本站不保证、不承担下载资源内容的准确性、安全性和完整性, 同时也不承担用户因使用下载资源对自己和他人造成任何形式的伤害或损失。
分类:法规文献 价格:1库币 属性:278 页 大小:1.22MB 格式:PDF 时间:2024-07-22
/ 278
客服
关注